Transformers rarely fail without warning, but the warnings are easy to normalise: a hum that changed, a temperature a little higher than last month, a small oil stain, a gas alarm that was reset and forgotten. This guide lists the signs in the order to check them, and what each one should trigger — inspection, testing, or taking the unit out of service.

Sound, heat and vibration changes

A change in hum, a new buzz, rattling, or vibration that was not there before can point at loose core clamping, a loose winding, or a cooling fan or pump problem. Compare with the unit's normal sound, not with another transformer, and check load and temperature at the same time: a hot, heavily loaded unit sounds different from a cool, lightly loaded one. Any sudden, loud change, or a sound accompanied by a protection trip, should be treated as an urgent inspection, not a note for the next outage.

Oil leaks, level changes and gas alarms

Oil staining, a falling conservator or bushing level, or a Buchholz gas alarm are never cosmetic. A leak admits moisture and lowers insulation strength; gas in the relay indicates internal activity that needs gas analysis and electrical testing before re-energising. Never reset a gas alarm and return a unit to service without investigating what produced the gas — the alarm is the protection doing its job, and silencing it removes the warning, not the fault.

Electrical trends: DGA, temperature and protection

Rising dissolved gases, a winding temperature that climbs faster than load explains, repeated differential or overcurrent operations, and tap-changer problems such as hunting or failed operations all deserve trending against history. A single event may be a test or setting issue; a trend across weeks or months is the unit telling you its condition is changing. Record every event with date, load and temperature, because a trend without dates cannot be read.

What to do first, in order

First, make the area safe and record what you observed, with load, temperatures and any alarms. Second, inspect visually without opening anything energised: oil level, leaks, gauges, fans, pumps and connections. Third, take oil samples and arrange electrical tests through the asset owner's engineer, and keep the unit out of service if there is evidence of internal discharge, a serious leak, or a protection operation you cannot explain. Never energise a transformer you suspect is damaged to see if the problem goes away.